A. DEVELOPMENT
SERVICING CHARGES
&
B. SERVICE CONNECTION FEES
With the introduction of a Development
Servicing Plan, Connection Fees have two basic components - a Development
Servicing Charge (a contribution towards infrastructure based on the
potential increase in demand on the system), and a Service Connection
Fee (the (averaged) cost of physically installing the connection and
meter). Land Developers are also required to meet the reticulation costs.
A.
DEVELOPMENT SERVICING CHARGES
URBAN RESIDENTIAL DEVELOPMENT SERVICING
CHARGE
NOTE: This charge is in addition to the applicable service
connection fee
| URBAN
- Including Township and Village - SINGLE RESIDENTIAL LOTS |
COST
PER LOT (based on Lot size)
|
|
Less
than
450sq m
|
450-2000sq
m
|
Less
than 2000sq m
|
| Lots
where developers have prepaid the fees appropriate at time of Development |
NIL
- (Note only applies for a single residence on the Lot) |
| Lots
(not prepaid) existing prior to 1/1/1994 and 2nd or subsequent services
(only where availability fees are being paid) |
1st
Service - NIL - (Note only applies for a single residence on the
Lot)
2nd and subsequent service based on $3400 per E.T.
|
| Lots
(not prepaid) created since 1/1/1994 |
$3400
|
$3400
|
$4080
|
| URBAN
- Including Township & Village - MULTIPLE RESIDENTIAL UNITS
|
PRICE
FOR MULIPLE UNITS
|
| Lots
where developers have pre-paid the fees |
Nil
- Provided correct charges have been pre-paid |
| Lots
(not prepaid) existing prior to 1/1/1994 |
Fee
applicable for newly created lots Less $3400 |
|
Lots
(not prepaid) created since 1/1/1994:
|
|
| MULTI-RESIDENTIAL
LOTS (MEDIUM DENSITY 1-2 STOREY) |
Developer
Charge Per Dwelling
|
| Dual
Occupancy - 1 Bedroom |
$3400
if lot size less than 450sq m per dwelling
|
| Dual
Occupancy - 2 Bedrooms |
| Dual
Occupancy - 3 or more Bedrooms |
| Duplex
- 1 Bedroom |
Applicable
charge for units if lot size
less than 450 sq m per dwelling
|
| Duplex
- 2 Bedooms |
| Duplex
- 3 or more Bedrooms |
| Units
- 1 Bedroom |
$815
|
| Units
- 2 Bedrooms |
$1220
|
| Units
- 3 Bedrooms |
$1630
|
| MULTI-RESIDENTIAL
LOTS (HIGH DENSITY Less than 2 STOREY) |
Developer
Charge Per Dwelling
|
| Multi
Storey Apartments - 1 Bedroom |
$670
|
| Multi
Storey Apartments - 2 Bedrooms |
$1020
|
| Multi
Storey Apartments - 3 or more Bedrooms |
$1365
|
|
NOTE:
The Minimum Developer Servicing Charge per Lot is $3400
|
| URBAN
- Additional Costs |
|
| Lots
served by Glen Oak distribution main or in a rural residential zone |
Additional
$1200 at time of
subdivision or development
|
| Lots
which require significatn supply mains in advance of intervening
development |
An
amount calculated to recoup the cost of the supply main over all
lots it may serve.
|
RURAL DEVELOPMENT SERVICING CHARGES
NOTE: These charges are in addition to
the applicable service connection fee.
The Development Servicing Charge for rural
connections is based on E.T.'s determined from service size. The following
charges relate to properties greater than 2000sq m. For smaller rural
properties divide the listed charge by 1.2
| RURAL
LOCATION |
PRICE
PER SERVICE CONNECTION
|
|
20mm
|
25mm
|
32mm
|
*40mm
|
*50mm
|
|
$
|
$
|
$
|
$
|
$
|
| BRUCEDALE
** |
4080
|
4080
|
6700
|
10,450
|
16,320
|
| BULGARY,
COLLINGULLIE, MANGOPLAH, CURRAWARNA, PLEASANT HILLS rural
pipelines
|
4080
|
4080
|
6700
|
10,450
|
16,320
|
| RURAL
supply not listed above |
4080
|
4080
|
6700
|
10,450
|
16,320
|
| ADDITIONAL
COSTS |
|
|
|
|
|
| *
The availability of a service connection greater than 32mm diameter
is dependent on the capacity to supply within the reticulation network. |
| **
If a tapping direct to Goldenfields Water County Council large diameter
main is required, the customer must arrange this with GWCC. They
will be a GWCC customer. |
NOTE: Due
to limitations of existing reticulation a capital contribution towards
upgrading may also be required for some rural connections, calculated
on an individual basis.
COMMERCIAL OR INDUSTRIAL DEVELOPMENT
SERVICING CHARGES
NOTE: These charges are in addition
to the applicable service connection fee.
Development Servicing Charges for Industrial
or Commecial developments are based on a charge of $3400 per E.T. (Equivalent
Tenement).
For Commercial or Industrial Development,
E.T's will be calculated by one of the following 2 methods - whichever
gives the Higher E.T.
Method 1: Use the Water Directorate Guidelines,
Table 3 and multiply the recommended E.T. value by a factor of 0.6.
Method 2: Calculate the E.T. by dividing
the assessed peak days demand by 5 kilolitres. Eg. A peak days demand
of 20 kilolitres = 4 E.T.
NOTE: At the time of subdivision,
the Developer Servicing Charge will be based on 1 E.T. per Lot. The
charges will then be re-assessed when the owner makes application for
connection to the water supply.
For Commercial Development E.T.'s
will be calcualted according to the Water Directorate Guidelines, in
particular Table 2, and by multiplying the recommended E.T. value by
a factor of 0.6
NOTE:
1. At the time of requesting a service
connection, the applicable E.T.'s will be recalculated and credit will
be given for any previously paid E.T.'s
2. Notwithstanding all of the above, there
will be a minimum Development Servicing Charge or $3400 per Lot, AND
the following minimum development servicing charges will apply to each
service connection, based on service connection size.
| SERVICE
SIZE |
Less
than
80mm
|
80mm
|
100
mm
(minimum 4 E.T.)
|
150mm
|
200mm
|
| Minimum
Charge |
$3400
|
$8700
|
$13,600
|
$30,600
|
$54,400
|
B.
SERVICE
CONNECTION FEES
URBAN
SERVICE CONNECTION
NOTE:
This fee is in addition to the Developer Servicing Charge
The
following urban connection fees include the costs of providing a tapping
from a watermain, service pipe to property boundary and the corresponding
size water meter, and in the case of 20mm and 25mm services a household
tap adjacent to the meter.
URBAN
- including Township & Villlage -
SINGLE RESIDENTIAL/
COMMERCIAL/
INDUSTRIAL DEVELOPMENTS |
PRICE
PER SERVICE CONNECTION
FOR
SINGLE UNIT
|
| |
20mm
|
25mm
|
32mm
|
*40mm
|
*50mm
|
| Lots
where developers have prepaid the fees appropriate at time of Development |
NIL
|
$400
|
$700
|
$1250
|
$1500
|
| All
other lots including 2nd or subsequent services |
$950
|
$1250
|
$1650
|
$2200
|
$2800
|
|
*The
availability of a service connection greater than 32mm diameter
is dependent on capacity to supply with the reticulation network.
|
URBAN
- including Township & Village -
MULTIPLE RESIDENTIAL UNITS |
PRICE
FOR MULITPLE UNITS
|
|
1
unit
|
2
units
|
3
units
|
4
units
|
5
units
|
Extra
units
|
| Lots
where developers have pre-paid the fees |
No
Additional Service Connection charge provided correct fees
as per the following line have been paid
|
| All
other lots including 2nd or subsequent services |
$950
|
$1150
|
$1350
|
$1550
|
$1750
|
$200
|
| These
prices apply to multi-unit residential developments provided for
by water connection(s) at any one time, and includes the cost of
bulk and individual meters. In the case of individual internal metering
of strata units, the owner is responsible for internal plumbing
required. |
| URBAN
- Additional Costs |
|
| a)
Where Baylis Street pavers need to be distributed |
As
per WWCC charges
|
| b)
Where the service requires a rail crossing and approval from the
Railway Authorities |
The
fees and charges that State Rail imposes (typically $2500)
|
| c)
Where the service connection generates other similar extraordinary
costs. |
A
fee assessed on a similar basis.
|
RURAL
SERVICE CONNECTION
The
following rural service connection fees include the tapping, provision
of service pipe for a distance not greater than 40 metres, and the water
meter. The service connection and meter will generally be located adjacent
to or within the road reserve containing the water main.
All
plumbing work, including installations on private property must be carried
out by a licensed plumber engaged by the customer. This includes the
component of a service line beyond the 40 metres included in the fee.
|
RURAL
LOCATION
|
PRICE
PER SERVICE CONNECTION
|
|
|
20mm
|
25mm
|
32mm
|
*40mm
|
*50mm
|
|
|
$
|
$
|
$
|
$
|
$
|
BRUCEDALE
**
BULGARY
COLLINGULLIE
MANGOPLAH
rural pipelines |
|
1150
|
1150
|
1850
|
2400
|
3000
|
| CURRAWARNA
rural pipeline |
$100/ha |
|
|
|
|
|
| Minimum |
1150
|
1150
|
1850
|
2400
|
3000
|
| Maximum |
2000
|
2000
|
2800
|
3300
|
3900
|
| PLEASANT
HILLS rural pipeline |
|
2000
|
2000
|
2800
|
3300
|
3900
|
| RURAL
supply not listed above |
|
1150
|
1150
|
1850
|
2400
|
3000
|
WALBUNDRIE
TO RAND PIPELINE
URANGELINE / BIDGEEMIA RURAL SCHEME |
Refer
to Engineering or Customer Services Officer regarding availability
and costing for these schemes |
|
SOME
RURAL SPUR PIPELINES INCURR ADDITIONAL COSTS.
REFER TO ENGINEERING OR CUSTOMER SERVICES OFFICER
|
| ADDITIONAL
COSTS |
|
| Where
the servcie requires a rail crossing and approval from the Rail
Authorities |
The
fees and charges that State Rail imposes
(typically $2500)
|
| Where
the service connection generates other similar extraordinary costs
|
A
fee assessed on a similar basis
|
| *
The availability of a service connection greater than 32mm diameter
is dependent on the capacity to supply within the reticulation network. |
| **
If a tapping direct to Goldenfields Water County Council large diameter
main is required, the customer must arrange this with GWCC. They
will be a GWCC customer. |
NOTE: Due
to limitations of existing reticulation a capital contribution towards
upgrading may also be required for some rural connections, calculated
on an individual basis.
LARGE SERVICE CONNECTIONS
This is the actual cost of installing the
service connection and will be determined on a case by case basis.
Applicable to 30th June 2009
|