DEVELOPMENT SERVICING CHARGES & RECOMMENDED SERVICE CONNECTION FEES

With the introduction of a Development Servicing Plan, Connection Fees have two basic components - a Development Servicing Charge (a contribution towards infrastructure based on the potential increase in demand on the system), and a
Service Connection Fee (the (averaged) cost of physically installing the connection and meter). Land developers are also required to meet the reticulation costs.

A. DEVELOPMENT SERVICING CHARGES

URBAN (RESIDENTIAL) DEVELOPMENT SERVICING CHARGE
NOTE: This charge is in addition to the applicable service connection fee.

URBAN - including Township & Village - Single Residential Lots COST PER LOT (Based on Lot size)
<450 m2 450 - 2000 m2 >2000m2
Lots where developers have prepaid the fees
appropriate at time of Development
   NIL - (Note only applies for a single residence on the Lot)
 Lots (not prepaid) existing prior to 1/1/1994 and 2nd or
subsequent services (only where availability fees are
being paid)
 1st Service - NIL - (Note only applies for a single residence
on the Lot)
2nd and subsequent service based on $3800 per E.T.
 Lots (not prepaid) created since 1/1/1994  $3700 $3700
$4425
 URBAN - including Township & Village - Multiple Residential Units
   PRICE FOR MULTIPLE UNITS
 Lots where developers have pre-paid the fees    Nil - Provided correct charges have been pre-paid
 Lots (not prepaid) existing prior to 1/1/1994    Fee applicable for newly created lots Less $3800
    LOTS (not prepaid) created since 1/1/1994
 MULTI-RESIDENTIAL LOTS (MEDIUM DENSITY 1-2 STOREY)    Developer Charge Per Dwelling
 Dual Occupancy - 1 Bedroom          $3800 if lot size > 450m2 per dwelling
 Dual Occupancy - 2 Bedrooms
 Dual Occupancy -3 or more Bedrooms
 Duplex - 1 Bedroom          Applicable Charge for units if lot
Duplex - 2 Bedrooms size <450m2 per dwelling
 Duplex - 1 Bedroom
 Duplex - 3 or more Bedrooms
 Units - 1 Bedroom    $915
 Units - 2 Bedrooms    $1370
 Units - 3 Bedrooms    $1825
MULTI-RESIDENTAIL LOTS (HIGH DENSITY > 2 STOREY) Developer Charge
Per Dwelling
Multi Storey Apartments - 1 Bedroom  $755
Multi Storey Apartments - 2 Bedrooms  $1140
Multi Storey Apartments - 3 or more Bedrooms  $1530
NOTE: The minimum Developer Servicing Charge per Lot is $3800
URBAN - Additional Costs
 
Lots served by Glen Oak distribution main or in a rural residential
zone.
 Additional $1390 at time of subdivision or
development.
Lots which require significant supply mains in advance of
intervening development.
 An amount calculated to recoup the cost of the
supply main over all lots it may serve.

RURAL DEVELOPMENT SERVICING CHARGES


NOTE: These charges are in addition to the applicable service connection fee The Development Servicing Charge for rural connections is based on E.T.'s determined from service size. The following charges relate to properties greater than 2000m2. For smaller rural properties divide the listed charge by 1.2

RURAL LOCATION PRICE PER SERVICE CONNECTION
20mm 25mm 32mm *40mm *50mm
$ $ $ $ $
RURAL PIPELINES ** 4560 4560 7470 11,675 18,240
ADDITIONAL COSTS  
* The availability of a service connection greater than 25mm diameter is dependent on the capacity to supply within the reticulation network.
 * * If a tapping direct to Goldenfields Water County Council large diameter main is required, the customer must arrange this with GWCC. They will be a GWCC customer.
Note: Due to limitations of existing reticulation a capital contribution towards upgrading may also be required for some rural connections, calculated on an individual basis.

COMMERCIAL OR INDUSTRIAL DEVELOPMENT SERVICING CHARGES

NOTE: These charges are in addition to the applicable service connection fee.

Development Servicing Charges for Industrial or Commercial developments are based on a charge of $3800 per E.T. (Equivalent Tenement).

For Commercial or Industrial Development, E.T.'s will be calculated by one of the following 2 methods - whichever gives the Higher E.T.

Method 1: Use the Water Directorate Guidelines and multiply the recommended E.T. value by a factor of 0.6.

Method 2: Calculate the E.T. by dividing the assessed peak days demand by 5 kilolitres. Eg. A peak days demand of 20 kilolitres = 4 E.T.

NOTE: At the time of subdivision, the Developer Servicing Charge will be based on 1 E.T. per Lot. The charges will then be reassessed when the owner makes application for connection to the water supply.

For Commercial Development, E.T.'s will be calculated according to the Water Directorate Guidelines, in particular Table 2, and by multiplying the recommended E.T. Value by a factor of 0.6

NOTE:
1. At the time of requesting a service connection, the applicable E.T.'s will be recalculated and credit will be given for any previously paid E.T.'s.
2. Notwithstanding all of the above, there will be a minimum Development Servicing Charge or $3800 per Lot, AND the following minimum development servicing charges will apply to each service connection, based on service connection size.

SERVICE SIZE <80mm 80mm

100mm (minimum 4 E.T.)

150mm 200mm
Minimum Charge $3800 $9730 $15,200 $34,200 $60,800

 

B. RECOMMENDED SERVICE CONNECTION FEES

URBAN SERVICE CONNECTION

NOTE: This fee is in addition to the Developer Servicing Charge

The following urban connection fees include the costs of providing a tapping from a water main, service pipe to property boundary and the corresponding size water meter, and in the case of 20mm and 25mm services a household tap adjacent to the meter.

URBAN - including Township & Village - SINGLE RESIDENTIAL / COMMERCIAL / INDUSTRIAL DEVELOPMENTS PRICE PER SERVICE CONNECTION FOR SINGLE UNIT
20mm 25mm 32mm *40mm *50mm
Lots where developers have prepaid the fees appropriate at time of Development NIL
$485
$965
$1610 $2145 
 All other lots including 2nd or subsequent services $1225  
$1710
$2190  $2835  $3370
* The availability of a service connection greater than 25mm diameters is dependent on capacity to supply with the reticulation network and must have Engineering approval.
URBAN - including Township & Village - MULTIPLE RESIDENTIAL UNITS PRICE FOR MULTIPLE UNITS
1 Unit 2 Units 3 Units 4 Units 5 Units Extra Units
Lots where developers have pre-paid the fees No Additional Service Connection Charge provided correct fees as per the following line have been paid      
All other lots including 2nd or subsequent services $1225 $1470 $1715 $1960 
$2205 $245
These prices apply to multi-unit residential developments provided for by water connection(s) at any one time, and includes the cost of bulk and individual meters. In the case of individual internal metering of strata units, the owner is responsible for internal plumbing required.
 URBAN - Additional Costs
      
 a) Where Baylis Street pavers need to be distributed.  As per WWCC charges
 b) Where the service requires a rail crossing and
approval from the Railway Authorities
The fees and charges that State Rail imposes (typically $2,500)
 c) Where the service connection generates other
similar extraordinary costs
 A fee assessed on a similar basis.
 Road underbore  $110.00 per metre

 

RURAL SERVICE CONNECTION

The following rural service connection fees include the tapping, provision of service pipe for a distance not greater than 40 metres, and the water meter. The service connection and meter will generally be located adjacent to or within the road reserve containing the water main.
All plumbing work, including installations on private property must be carried out by a licensed plumber engaged by the customer. This includes the component of a service line beyond the 40 metres included in the fee.

RURAL LOCATION PRICE PER SERVICE CONNECTION
20mm 25mm 32mm *40mm *50mm
$ $ $ $ $
RURAL PIPELINES**  1395 1880 2360 3005 3540
 WALBUNDRIE TO RAND PIPELINE, URANGELINE/BIDGEEMIA RURAL SCHEME
Refer to Engineering staff regarding availability and costing for these schemes
      SOME RURAL SPUR PIPELINES INCUR ADDITIONAL COSTS.
REFER TO ENGINEERING OR CUSTOMER SERVICES OFFICER
 ADDITIONAL COSTS
     
Where the service requires a rail crossing
and approval from the Rail Authorities
 The fees and charges that State Rail imposes
(typically $2,500)
 Where the service connection generates
other similar extraordinary costs
 A fee assessed on a similar basis
 Road Underbore
$110.00 per metre
* The availability of a service connection greater than 25mm diameter is dependent on the capacity to supply within the reticulation network and must have Engineering approval.
 * * If a tapping direct to Goldenfields Water County Council large diameter main is required, the customer must arrange this with GWCC. They will be a GWCC customer.


Note: Due to limitations of existing reticulation a capital contribution towards upgrading may also be required for some rural connections, calculated on an individual basis.

All fees apply up to 30th June 2013